How Long Does Cabinet Refinishing Take? Timeline Guide
Planning your kitchen renovation timeline? Here's exactly what to expect for professional cabinet refinishing, from start to finish.
One of the most common questions we receive is "How long will my kitchen be out of commission?" Here's a detailed timeline of the professional cabinet refinishing process.
Average Timeline
**Standard Kitchen (20-40 doors):** 3-5 days **Large Kitchen (40-60 doors):** 5-7 days **Extra Large Kitchen (60+ doors):** 7-10 days
Day-by-Day Breakdown
Day 1: Preparation - Remove all cabinet doors and drawers - Label everything for reinstallation - Set up spray booth/work area - Degrease all surfaces - Initial sanding
Day 2: Priming - Apply bonding primer to all pieces - Prime cabinet frames (boxes) - Allow proper dry time - Light sanding between coats
Day 3-4: Painting - Apply first coat of finish paint - Allow cure time (4-8 hours) - Light sanding with 320-grit - Apply second coat - Third coat if needed
Day 5: Reinstallation - Install new hardware - Rehang doors and drawers - Touch-ups as needed - Final inspection - Clean up
Factors That Affect Timeline
**Kitchen Size:** More cabinets = more time
**Condition:** Heavily damaged or greasy cabinets need more prep
**Color Change:** Dark to light requires more coats
**Wood Type:** Oak grain fill adds 1-2 days
**Weather:** Humidity affects dry times
Can It Be Done Faster?
In some cases, yes: - On-site spraying vs off-site can be faster - Multiple crew members - Ideal weather conditions - Good cabinet condition
Kitchen Usability During Process
You can typically: - Use appliances (stove, refrigerator) - Access countertops - Use kitchen sink
You cannot: - Access cabinet contents - Open/close cabinet doors - Use kitchen normally
Tips for Faster Completion
1. Clear out cabinets before we arrive 2. Ensure good ventilation 3. Maintain consistent temperature 4. Schedule during low-humidity season